Post Content
A boiler works constantly so that you have a warm house and hot water. Boilers are an important part of a property and if you wish it to work efficiently and safely then you will have to take good care of it. Maintenance of the boiler makes sure that it keeps on functioning without any problem.
Fitting a new boiler or making repairs takes time. The time required to bring back the boiler to its best condition depends on the extent of the problem. The simple repairs can take just one to two hours while some can take days.
There are several factors that determine the time it takes to fit or fix a boiler. Here are a few common factors:
-
The Complexity of Installation:
If you are looking to install a boiler then you should make sure that you hire a service that offers the best boiler installation in London. If you are looking to swap the old boiler for the new one that is the same then it is not going to take long. Replacing the boiler without changing the location takes just one to two days. As the complexity of the installation process increases the time required to finish the fitting or repairs also increases.
-
New Boiler Location:
Changing the location of the boiler requires more time than usual. When you are changing the location of the boiler you will have to change the existing pipework. Installing new pipework can take more than two days. Changing the location of the boiler can add an extra one or two days to complete the installation process. If the new location is far away from the original one then more pipework is required.
-
Upgrading the System:
If the boiler you have is getting too old then you need to invest in an upgrade. The time required to install the new type of boiler then the time will depend on the type you choose to install. If you are switching from the conventional boiler to a combi one then you will have to get rid of the hot water cylinder and water tank.
You will also need to update the pipes so that they can accommodate the new boiler. If you want to know the timeline of the project then you can ask a surveyor to advise you about the time implications.
Combi Boiler Upgradation or Replacement
If you are looking to get rid of a combi boiler and get a system or conventional boiler then the installation is more complicated. It will need extra time for installation because you will need to install some extra pipe-work. You will need to allocate approximately three to four days for this type of installation.
-
Power Flushing:
The installation of a new boiler requires power flushing as it helps in getting rid of debris that may be present in the heating system. If the system is old and inefficient then you should need to do power flushing.
The chemical flush can take approximately one to two hours and the power flush can take about five hours. You need to consider the time of power flushing in mind so that you have the right estimate.